After-Action Report:
Introduction
Exercise Objectives
Summary of Findings
Recommendations
Appendix 1: Participants
Appendix 2:
Evaluation
Objective1:Resource
Objective2:Purchasing
Objective3:Technical
Objective4:Communication
Objective5:PIO
Appendix 3:
Detailed Findings
General Comments
Staffing
Training
ECC Systems
Operations
Resource Management
Planning
Technical Information
Communications
Public Information
Complete Report
(no photos/navigation)
| |
Purchase Request Processing
Finance/Purchasing staff will demonstrate the ability
to coordinate and track emergency purchase requests from the ECC, or work cooperatively
with their remote office.
POINTS OF REVIEW:
- Did purchasing staff document all purchasing requests and outcomes? Somewhat.
The only documentation provided to the Logistics section were message forms and unit logs.
They did use both of these for documentation. However, a resource status board is a great
tool for keeping the ECC posted on where their resources are, and also an ICS 201 is
another great tool.
- Did purchasing staff utilize existing vendor records when available in order to
expedite purchases? No. The Logistics personnel noticed right away that
they did not have any vendor information except for the phone books. They indicated that
they would be bringing their vendor city and county contractor records in the future. A
resource guide is another handy document, but takes a lot of time to compile and update on
a regular basis.
- Were purchasing requests prioritized to reflect emergency planning objectives?
No. This was not done due to two major points. One, there were never
any planning objectives set for the ECC. Two, Logistics was left out of the internal
communication loop. If they are not told what the priorities are (such as in the foam
needed for the fire) they can not meet them.
Go to Summary of Findings or see detailed
findings on Resource Management. Additional
findings not related to the objectives can be found under General
Comments, Staffing, Training, ECC Systems, and Operations.
View more evaluation points:
Objective 1: Resource information
utilization
Objective 2:
Purchase request processing
Objective 3: Technical information in
long-range planning
Objective 4: Communications accuracy
Objective 5: Public information
coordination
|